• IntelliServ Case Studies

    Land

    Deliver wells faster in high volume drilling campaigns with Wired Drill Pipe from IntelliServ™ 
    Location: Oklahoma
    Read more  

    Wired Drill Pipe was commercially installed on a multi-well campaign in the Bakken Formation to enable NOV Automation. Through WDP telemetry, downhole data drive the rig surface equipment to safely increase drilling performance.
    Location: North Dakota
    Read more

    Offshore

    Operator increased ROP by 300% and saved 10.7 days per reservoir section.
    Location: North Sea
    Read more

    Operator saved a total of 2.5 days per reservoir section.
    Location: North Sea
    Read more

    Operator reduced telemetry related time by >2 days per well and reduced drilling time by >5 days per well.
    Location: North Sea
    Read more

    Operator reduced telemetry related time by 1.3 days and drilling time by 1.2 days per reservoir section for a total of 2.5 days saved per reservoir section.
    Location: North Sea
    Read more

    Wired Drill Pipe eliminates rig time associated with data transmission, ROP and Bit/ BHA runs to total depth.
    Location: UK Sector of North Sea
    Read more

     

     

    Partner Case Studies

    Results 1 - 4 of about 4.
    Page 1 of 1   < 1 > 
    Page 1 of 1   < 1 >